国产一区二区三区无码精品久久,亚洲特黄一片,打开就能看的欧美黄片,亚洲精品字幕久久

歡迎訪問永誠廣建公路材料(山東)有限公司網(wǎng)站!

永誠廣建公路材料(山東)有限公司

熱線電話

15165180688

您現(xiàn)在所在的位置 :首頁 - 新聞中心 > 行業(yè)資訊

行業(yè)資訊

攤鋪機出租之后施工中的注意事項

來源:http://apdetong.cn/ 日期:2022-08-19
在攤鋪機開始施工之前,應(yīng)該先做一系列檢查,確定大型路面機器設(shè)備沒有問題方可開始正常作業(yè),那么攤鋪機在運行的過程中,我們需要具備怎樣的特殊技術(shù)要求呢?下面跟著濟南攤鋪機出租廠家一起來看看出租攤鋪機之后施工中的注意事項吧:
Before the construction of the paver, a series of inspections should be carried out to ensure that the large-scale pavement machinery and equipment are free of problems before the normal operation. What special technical requirements do we need to have during the operation of the paver? Let's follow the Jinan paver rental manufacturer to see the precautions in construction after renting the paver:
(1)按照施工的嚴格要求,合理確定攤鋪機出租之后的工作速度、攤鋪寬度、攤鋪厚度、刮板輸送器及螺旋分料器轉(zhuǎn)速、斗門開度等技術(shù)參數(shù)。
(1) According to the strict requirements of construction, reasonably determine the working speed, paving width, paving thickness, speed of scraper conveyor and spiral distributor, opening of bucket door and other technical parameters of the paver after leasing.
(2)機械在傳動的瀝青混合料攤鋪機機,換檔一定須在攤鋪機完全停止時進行,并嚴禁用力掛檔。
(2) For the asphalt mixture paver driven by machinery, the gear shift must be carried out when the paver is completely stopped, and it is strictly prohibited to shift with force.
(3)準備卸料時,攤鋪機推輪靠近自卸車后輪,自卸車掛空檔。攤鋪機同時推動兩個。
(3) When preparing for unloading, the pushing wheel of the paver shall be close to the rear wheel of the dump truck, and the dump truck shall be in neutral. The paver pushes two at the same time.
濟南攤鋪機出租
(4)攤鋪機的所有部件和系統(tǒng),必要時應(yīng)及時協(xié)調(diào)和校正。運行速度應(yīng)保持穩(wěn)定,停車和啟動次數(shù)應(yīng)盡量減少,以保持設(shè)備的連續(xù)和平衡運行。
(4) All components and systems of the paver shall be timely coordinated and corrected when necessary. The operation speed shall be stable, and the number of shutdown and startup shall be minimized to maintain the continuous and balanced operation of the equipment.
(5)嚴禁操作人員在設(shè)備作業(yè)時離開駕駛臺,無關(guān)人員不得在作業(yè)時上、下設(shè)備,或在駕駛臺上停留。
(5) It is strictly prohibited for operators to leave the bridge during equipment operation. Irrelevant personnel are not allowed to get on and off the equipment or stay on the bridge during operation.
(6)攤鋪機轉(zhuǎn)場后若是在行駛的過程中,禁止在坡道上換檔,或空檔下坡滑行。攤鋪作業(yè)前20-40min,對熨平板進行預(yù)熱,使其接近瀝青混合料的攤鋪溫度;因故暫停作業(yè)時,使用預(yù)熱系統(tǒng)進行保溫,防止熨平板冷卻;用電預(yù)熱時,應(yīng)先啟動發(fā)動機。
(6) If the paver is running after transfer, it is prohibited to shift gears on the slope or slide down the slope in neutral. Preheat the screed 20-40min before paving to make it close to the paving temperature of asphalt mixture; When the operation is suspended for some reason, the preheating system shall be used for thermal insulation to prevent the screed from cooling; When preheating with electricity, start the engine first.
此外現(xiàn)在很多工程機械設(shè)備都會選擇大型正規(guī)公司進行租賃,我們在選擇攤鋪機設(shè)備公司的時候,須多方對比,簽訂相應(yīng)的租賃合同,主要是了解混凝土攤鋪機設(shè)備的概況,使用程度,有沒有嚴重的損壞,還有租賃期限,所租賃的收費情況,這些都是要提前了解清楚的。更多事項就來我們網(wǎng)站http://apdetong.cn咨詢了解吧!
In addition, many construction machinery and equipment will be leased by large-scale regular companies. When we choose the paver equipment company, we must compare with each other and sign the corresponding lease contract. The main purpose is to understand the general situation of the concrete paver equipment, the degree of use, whether there is serious damage, the lease term, and the rental charges. All these should be understood in advance. For more information, please visit our website http://apdetong.cn Consult and understand!
  • 上一條:挖掘機租賃公司應(yīng)該注意什么
  • 下一條:好好使用挖掘機就要多了解相關(guān)事項
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞:

    经典三级视频一区 欧美 亚洲| 搞91AV视频| 日产码久久久久| 欧洲性一区二区| 国产欧美综合性| 日韩aV片色婷婷色| 久久综合中文一区吧| 丰满少妇一二三区| 女的被操在线| 国产日韩有码一二三| 欧洲无码精品亚洲无码精品| 久久AV1区二区| 一区二三区四五| 91亚洲欧美综合高清在线| 铜梁县| 男生抽插女生小穴91| 精品激情 射射| 亚洲精品12P| AV蜜臀在| 国产黄色3级片老鸭窝| av电影免费| 内射日本极品美女| 久久久亚洲| 91天天添天天添| 大香焦手机在线| 久久精品欧美黄片| 在线国产日B视频| 三级色综合| 国产夫妻自拍性生活一级黄片| 国产在线精品中文欧美| 二级版国产| 久久大香蕉一| 五月婷婷视频免费在线观看| 国产女大学生自慰给我看在线| 欧美精品一区二区三区无码视频| 欧美中日韩性黄一级在线观看| 草三八免费视频| 欧美日韩在线四五六区| 日韩在线卡一| 婷婷深爱基地五月| 92日韩午夜福利午夜福利|