水穩(wěn)砼的養(yǎng)生是怎么個(gè)情況?

來(lái)源:http://apdetong.cn/ 日期:2023-01-28
濟(jì)南水穩(wěn)砼既是保證水泥穩(wěn)定碎石(砂礫)強(qiáng)度的需要,又是減少和避免干縮裂縫的措施。因此,每一段底基層碾壓完成并經(jīng)壓實(shí)度檢測(cè)合格后,應(yīng)立即開始養(yǎng)生,養(yǎng)生宜采用不透水薄膜、濕砂、草袋、棉毯覆蓋并灑水保濕養(yǎng)生。
Jinan water stabilized concrete is not only the need to ensure the strength of cement stabilized crushed stone (gravel), but also the measure to reduce and avoid dry shrinkage cracks. Therefore, after each section of subbase is rolled and passes the compactness test, the curing should be started immediately. The curing should be covered with impermeable film, wet sand, straw bag, cotton blanket, and watered for moisturizing.
基層完成后要及時(shí)交給路面施工單位,進(jìn)行瀝青乳液養(yǎng)生,避免基層長(zhǎng)期暴曬。養(yǎng)生期不宜少于7天,并應(yīng)封閉交通,除灑水車輛外,嚴(yán)禁其它車輛通行?;鶎舆^(guò)冬時(shí),應(yīng)采取覆蓋保溫措施,以防止基層開裂或表面受損可采取先鋪塑料薄膜后覆蓋粘土的措施,減少和避免因溫差過(guò)大時(shí)產(chǎn)生溫縮裂縫。
After the base course is completed, it shall be timely delivered to the pavement construction unit for asphalt lotion curing to avoid long-term exposure of the base course. The curing period should not be less than 7 days, and the traffic should be closed. Except for the watering vehicles, other vehicles are not allowed to pass. During the winter of the base course, the thermal insulation measures shall be taken to prevent the base course from cracking or surface damage. The measures of first laying plastic film and then covering clay can be taken to reduce and avoid temperature shrinkage cracks caused by excessive temperature difference.
水穩(wěn)砼攤鋪后,當(dāng)水穩(wěn)砼的含水量等于或略大于佳含水量時(shí),應(yīng)及時(shí)根據(jù)試驗(yàn)段確定的碾壓工藝,用輕型壓路機(jī)并配合20T以上壓路機(jī)在結(jié)構(gòu)層全寬內(nèi)進(jìn)行碾壓。碾壓段長(zhǎng)度根據(jù)試驗(yàn)段確定的長(zhǎng)度及氣溫情況確定,氣溫高時(shí),水分蒸發(fā)快,縮短碾壓段長(zhǎng)度,反之,可適當(dāng)延長(zhǎng)碾壓段長(zhǎng)度,以40-50米為宜,過(guò)短則易造成平整度較差。
After paving the water stabilized concrete, when the water content of the water stabilized concrete is equal to or slightly greater than the optimum water content, the light roller shall be used in time according to the rolling process determined in the test section, and the roller above 20T shall be used for rolling within the full width of the structural layer. The length of the rolling section is determined according to the length determined by the test section and the temperature. When the temperature is high, the water evaporates quickly and the length of the rolling section is shortened. On the contrary, the length of the rolling section can be appropriately extended, preferably 40-50 meters. If it is too short, it is easy to cause poor flatness.
濟(jì)南水穩(wěn)砼
碾壓方式初壓一般采用膠輪壓路機(jī)或鋼輪壓路機(jī)靜壓1-2遍,復(fù)壓采用振動(dòng)壓路機(jī)弱振強(qiáng)度2-4遍,終壓采用鋼輪壓路機(jī)或膠輪壓路機(jī)靜壓1-2遍,碾壓速度初、終壓宜為1.5-1.7Km/h,復(fù)壓宜為2.0-2.5Km/h,直線和不設(shè)超高的平曲線段,由兩側(cè)路肩向路中心碾壓,設(shè)超高的平曲線段,由內(nèi)側(cè)路肩向外路肩進(jìn)行碾壓。
Rolling method: the initial rolling shall be carried out by rubber wheel roller or steel wheel roller for 1-2 times, the re-rolling shall be carried out by vibratory roller with weak vibration strength for 2-4 times, the final rolling shall be carried out by steel wheel roller or rubber wheel roller for 1-2 times, the initial and final rolling speed shall be 1.5-1.7Km/h, the re-rolling speed shall be 2.0-2.5km/h, the straight line and the flat curve section without superelevation shall be rolled from the shoulders on both sides to the road center, and the flat curve section with superelevation shall be set, Rolling shall be carried out from the inner shoulder to the outer shoulder.
碾壓時(shí),輪跡應(yīng)重疊1/2輪寬。相鄰兩段的接頭處,應(yīng)錯(cuò)成橫向45°的階梯狀碾壓。嚴(yán)禁壓路機(jī)在已完成或正在碾壓的路段上“調(diào)頭”和急剎車。自拌和至碾壓結(jié)束原則控制在2h以內(nèi)。您對(duì)該產(chǎn)品還有什么問(wèn)題或者需求都能隨時(shí)來(lái)我們網(wǎng)站http://apdetong.cn做咨詢!
When rolling, the wheel track shall overlap 1/2 wheel width. The joints of the two adjacent sections shall be staggered into a 45 ° transverse stepped rolling. It is strictly prohibited for the roller to "turn around" and brake sharply on the road section that has been completed or is being rolled. From mixing to rolling, it shall be controlled within 2h in principle. If you have any questions or needs about this product, please come to our website at any time http://apdetong.cn Consulting!
  • 上一條:土的含水量對(duì)壓路機(jī)壓實(shí)過(guò)程的影響
  • 下一條:提高路面機(jī)械設(shè)備工作穩(wěn)定性的措施
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞:

    日韩无码一二三区图片| 无码爱嗳一区二区三区在线| 999精品一区二区三区中出合集 | 亚洲午夜影院2014| jiujiujiu久久艹| 福利国产小视频在线视频| 91偷拍一区二区三区| 青青大香蕉久久伊人| 欧美一区二区日韩二区三区| 小穴喷水视频在线| 天天色综合久久网| 一区二区免费不卡国产_| 人日本妻一区二区| 99久久日韩| 日本国产一卡二卡在线观看| 人妻久久久一区二区三区| AV一区 二区 三区| 欧美成人国产一区二区| 欧美爆菊精品一区二区三区| 美女视频一区二区三区四区| 岛国人妻中文字幕精品福利| 草少妇久久久久久久久久| 亚洲无码成年人综合网| 亚洲一区二区三区A久久| 色综合91一区二区久久麻豆| 精英久久久久久久| 91色伊人| 五月婷婷六月丁香视频| 国产韩国日本不卡| 午夜宫AV电影| 色哟哟视频入口| 小骚逼视频91| 日韩无套内射| 日本一区二区三区精品观看| 色婷婷久久综合****狠狠野花| 热久久超碰这里只有精品| www.91.com另类图片视频| 一区不卡三卡| 刺激欧美黄片在线看| 后入欧美翘臀少妇| 国产女同一区二区精品|